New forensic science lab in Kildare to open later this month

A 3D view of the new facilityplaceholder image
A 3D view of the new facility

A new forensic science lab in Co Kildare is due to open later this month.

The world-class facility for Forensic Science Ireland at Backweston, Celbridge will be equipped with physical, chemical and DNA analysis laboratories.

Minister for Justice Helen McEntee said today: "I am also very pleased with the progress that has been made on the Backweston laboratory in Celbridge.

“This new facility is a significant investment by the Government in the future of forensics services in Ireland and in building stronger, safer communities.

"Construction on it is now complete and I look forward to attending the official opening at the end of this month."

The minister was speaking as she published the Forensic Science Ireland (FSI) Annual Report for 2022.

The estimated €65m lab will include approximately 9,550 square metres of internal floor space with state of the art facilities including air-exchange control to enable appropriate air-flow control in DNA sensitive areas such as the DNA database.  

The new facility will also include an additional building (approx. 485 square metres) to provide storage space for the broad range of exhibits and items that are routinely submitted to FSI for examination.   

It will provide a scientific service to the criminal justice system by analysing samples submitted from crime scenes and providing expert evidence in criminal trials.

Related topics:
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice