Laois housing estates Lakeglen and O'Moore Place to be surveyed for flood issue


'Literally covered in water' call to drain road linking Portlaoise housing estates
The road between two of the oldest Portlaoise council built housing estates is getting "literally covered in water" in heavy rain.
Laois County Council has been asked to carry out drainage works in Lakeglen, and on the connecting road to O'Moore Place.
Cllr Caroline Dwane Stanley described the problems, as she tabled a motion with her request to the April meeting of Portlaoise Municipal District.
"There is one section between O'Moore Place and Lakeglen. When it's raining heavily the road is literally covered in water.
"Around the corner where the two new houses are built in Lakeglen, there's a section of the road ponding. It looks like the manhole is clear but there must be something blocking it underneath where the water is not getting away.
"This is going on years. I do believe we'll need to get proper funding. Every time it rains I get calls about the road being impassible at time," Cllr Dwane Stanley said.
In reply, Portlaoise MD engineer Wes Wilkinson said they will use a combination of cameras and trial holes to excavate and see where the blockage is.
"We are busy particularly at this time of year. It is on our list. It will be early summer before we can get to it," he added.
The job will then be considered for an application for funding to do drainage works in 2027.
Cllr Catherine Fitzgerald seconded the motion.
