Part of the M53 in Cheshire was closed on Saturday night to accommodate what is thought to be one of the biggest objects to be moved on a UK road.
The structure is part of a £45 million furnace that is being installed at Essar’s Stanlow oil refinery and will be the first capable of running entirely on hydrogen.

1.

2.
Gordon Beattie, National Highways’ abnormal loads manager for the North West, said: “There are abnormal loads and there are abnormal loads – and this one will completely fill the motorway.

3.
“The module will be mounted on two wheeled platforms – one on each carriageway – and will look a bit like the bridge of a container ship gliding down the motorway.”

4.
1 / 2

