Delayed call bells, soiled dining room among HIQA findings at Donegal nursing homes

The Brindley Manor nursing home in Convoy was one of three homes to be inspected in Donegal placeholder image
The Brindley Manor nursing home in Convoy was one of three homes to be inspected in Donegal | File pic

HIQA reports reveal a mixed picture across Donegal nursing homes, with serious concerns identified before improvements were made in staffing, care and oversight.

The Health Information and Quality Authority (HIQA) has published a series of inspection reports covering three Emeis Ireland nursing homes in County Donegal, showing a mixed picture of care standards ranging from significant improvements in some areas to repeated concerns around staffing, governance and the layout of twin-occupancy bedrooms.

The inspections form part of a wider national review of 24 nursing homes operated by Emeis Ireland following a 2025 RTÉ Investigates programme which highlighted serious concerns in two of its other facilities in Dublin and Laois. None of the Donegal homes featured in the programme and no allegations were made in relation to them.

HIQA carried out multiple unannounced inspections at Beach Hill Manor, Fahan, Brindley Manor, Convoy, and Brentwood Manor, Convoy between June and December 2025.

At Beach Hill Manor, a 48-bed nursing home in Fahan, HIQA carried out three inspections over the period from July to December.

Early inspections in July and September identified significant concerns including staffing shortages, delays in responding to residents’ call bells, insufficient supervision of high-dependency residents, unsafe manual handling practices, infection prevention and control issues, and weaknesses in medication management and care planning.

Inspectors also raised concerns about the layout and size of some twin-occupancy bedrooms, noting limited space, reduced privacy and inadequate storage for residents’ belongings.

In September, inspectors recorded call bells ringing for up to five to seven minutes before being answered. They also found that staffing levels were not sufficient to meet residents’ social care needs. Unsafe moving and handling practices and infection control issues were also observed.

However, by December, HIQA reported significant improvements across the centre, with residents giving positive feedback and staff observed providing respectful, attentive care in a more structured environment. The home was described as having a “festive atmosphere” with improved activity provision.

Improvements were also noted in infection control, medication management, care planning and oversight systems. Inspectors found better use of pressure-relieving equipment and improved monitoring of clinical care.

Despite this, HIQA again highlighted ongoing concerns regarding the layout of five twin-occupancy bedrooms, which it said did not fully meet residents’ privacy, dignity and mobility needs. The Inishowen nursing home stated that changes had been made to address these issues by the end of December 2025.

The publication of the Beach Hill Manor reports comes weeks after HSE officials revealed that residents had been relocated from Buncrana Community Hospital following a HIQA inspection that identified serious fire safety concerns last year.

While the issues identified at the two facilities were different in nature, both centres have come under significant regulatory scrutiny and were required to implement improvements to meet HIQA standards.

Buncrana Community Hospital is to be redeveloped, and the project was to proceed to tender at the end of June. If timelines remain on track, construction is expected to begin towards the end of this year. From the date contractors begin work on site, the build programme is expected to take approximately 18 months.

At Brindley Manor Private Nursing Home in Convoy, HIQA carried out inspections in June and November of last year.

The June inspection found issues including insufficient staffing at night, poor infection prevention and control practices, gaps in training and staff supervision, and weaknesses in care documentation. Inspectors also raised concerns about the layout of twin bedrooms and governance systems.

A follow-up inspection in November found that compliance had improved, with inspectors reporting that residents were supported to live comfortably in the centre and that staff interactions were person-centred. The home was generally well maintained and visibly clean, although inspectors identified concerns regarding the layout of four twin-occupancy bedrooms and limited storage space for residents' equipment.

HIQA acknowledged that the facility had made progress in implementing actions from the June inspection, with premises the only area found to be non-compliant.

While inspectors said further improvements were required to the layout of the twin bedrooms and the centre's sluice rooms, they found overall compliance had improved. Following the inspection, the restrictive condition placed on the centre's registration was removed, allowing admissions to resume.

At Brentwood Manor, Convoy, inspections in June and November 2025 produced mixed findings.

The June inspection found generally positive feedback from residents and families, with staff described as kind and compassionate. However, inspectors identified issues in governance, care planning and referrals to healthcare professionals.

A follow-up inspection in November found that residents were generally supported to live comfortably in the centre and received good standards of nursing care. However, inspectors identified a serious environmental issue, including soiled dining areas which posed an immediate infection risk, prompting inspectors to require urgent cleaning during the inspection.

Inspectors again raised concerns about the layout of several twin-occupancy bedrooms, including limited space, reduced privacy, restricted access and insufficient storage for residents’ belongings. Equipment stored in corridors was also identified as a potential safety hazard.

HIQA noted that while improvements had been made in some areas, repeated concerns remained regarding governance and the suitability of parts of the premises.

Unlike Beach Hill Manor and Brindley Manor, the restrictive condition on Brentwood Manor's registration remains in place. The centre, which provides care for up to 56 residents with dementia and other cognitive conditions associated with brain injury or major illness, has committed to a programme of remedial works. These include further changes to the layout of twin-occupancy bedrooms, the removal of obstructions, improved storage arrangements and refurbishment works. A review of six twin-occupancy bedrooms was due to be completed by April 2026, with no new residents to be admitted to those rooms until the work has been completed.

Overall, the inspections found that all three nursing homes had made improvements over the course of last year, although the extent of those improvements varied between the centres.

Beach Hill Manor showed significant progress between the July and December inspections, while Brindley Manor also demonstrated improved compliance by November, leading to the removal of its registration restriction. Brentwood Manor was found to be providing good standards of care in many areas, but continued to face regulatory concerns relating to governance and the layout of several twin-occupancy bedrooms, with a restrictive condition remaining due to the layout of the premises.