Planning permission has been granted for a new pedestrian ramp, revised vehicle access and additional parking at the Glengad Youthreach Centre following changes to the original plans.
Planning permission has been granted by Donegal County Council for accessibility and safety improvements at the Education and Training Board (ETB) Youthreach Centre in Glengad.
The application was submitted by Anne McHugh, Chief Executive of Donegal ETB, and provides for a vehicle and pedestrian set-down area at the front of the centre, adjoining the Malin to Glengad road.
The works will include a new pedestrian access ramp and steps, as well as a new front boundary wall and additional car parking spaces to the rear of the building.
According to the planning application, the aim is to improve safety for people using the facility and enhance access to the building for people with disabilities.
The Glengad Youthreach Centre is located across the road from Inishowen Frozen Foods and adjacent to the Fisherman’s Inn.
The application, which was submitted at the start of the year, underwent a number of revisions following concerns raised by Donegal County Council’s Roads Section regarding the original access arrangements.
After reviewing revised layout drawings submitted at the end of May, the Roads Section remained dissatisfied with the proposals, citing concerns about the space available for vehicles approaching the exit.
In its observations, the Roads team stated that the revised drawing created a potential hazard because there was insufficient room for a car or minibus to approach the exit at a right angle.
The Roads department also highlighted the need for adequate visibility in both directions, stating that exits should be positioned at a right angle and provide minimum visibility lines of 2.4 metres by 90 metres. It further specified that all passenger set-down locations should be accommodated within the site.
Following a subsequent meeting with the Roads Section, further revised plans were submitted to the council in July.
Under the amended proposals, the existing access will operate as an exit only, while a new access positioned perpendicular to the road will improve the safety of vehicle movements. The Roads Section was satisfied with the updated arrangements, taking account of the proposed pedestrian setback and internal set-down area.
Donegal County Council granted planning permission subject to three conditions covering the approved layout, drainage and the construction of parking and access areas.
The first condition requires the development to be carried out in accordance with the plans and details submitted, particularly the revised Site Layout drawing received on July 13.
Another condition outlined by the planning authority is that no surface water from the site is permitted to discharge onto the public road, while measures must also be taken to prevent water from the public road flowing onto the ETB property.
The final condition sets out requirements for the construction and layout of the car park, internal service road and entrance area.
These areas must be appropriately designed for their intended use and surfaced in bituminous macadam with a minimum thickness of 40mm. Parking spaces must be clearly marked, including designated disabled parking bays, circulation lanes and areas that must remain free of parked vehicles.