People concerned about speed through Dromod

Street gullysplaceholder image
Street gullys

Flooding issues also raised at council meeting

Cllr Sean McGowan said that people are concerned about the "speed at which traffic goes through Dromod village from both sides" when he called on Senior Engineer, Terry McGovern, and District Engineer, Darragh O’Boyle, to put in place a programme of works to carry out certain engineering works in Dromod.

He asked that the department provide up to four additional street gullies on the left side as you leave the village from the old Garda Barracks up towards Crowe's Garage at the Dromod Beg end of the village.

He also asked them to consider the possibility of providing table top ramps at each entrance into Dromod and one in the middle near the entrance to the old Western Meats factory to slow the traffic going through the village.

Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice