Major HSE investment in hundreds of solar panels at Laois hospitals


HSE wants to install solar panels in Portlaoise and Abbeyleix facilities
A big investment in green energy is in the pipeline at Portlaoise hospital and the Abbeyleix community nursing unit with the HSE planning to install scores of solar panels at both facilites.
The HSE says the project involves the design, installation and commissioning of a 250 kWp roof-mounted Solar PV system at Midlands Regional Hospital Portlaoise (MRPH) and a similar system at Abbeyleix Community Nursing Unit (CNU), known locally as Abbeyleix hospital.
Apart from putting panels on the roofs of both buildings, the HSE is considering the location of panels on the roof of a new carport and pedestrian walkway system in the grounds of Portlaoise hospital.
The HSE’s estates office in Tullamore has invited bids for the design, installation and commission of rooftop solar PVs at two locations. Included in the contract is a request to carry out a feasibility assessment for a solar panel-clad carport and covered pedestrian walkway system at MRHP.
Tender documents provided to potential bidders include a feasibility study commissioned by the HSE from Active8 Solar Energies in partnership with SSE Eirtricity. Based on the installation of 608 panels, costing over €330,000, the consultants estimated that the investment of public funds would be covered in 12 years at the Portlaoise health campus.
It is also estimated that the accumulated savings to the HSE over 20 years of operation would be nearly €580,000 with a cumulative cash flow over two decades of nearly €250,000. MORE BELOW PHOTO.


The feasibility study estimates that 16% of Portlaoise Hospital’s annual energy consumption would be made up of solar power. This would reach a quarter of usage in June.
There are also estimates on how much less carbon emissions from climate change would be generated by the hospital solar power is generated on-site. The report advises that nearly 40,000 kg of CO2 emissions would be avoided annually through the installation of panels on existing hospital roofs. A carport clad with solar panels spanning up to 8 metres could result in nearly 23,000 kg of CO2 emissions not being produced annually by the hospital.
The tender pack does not include an analysis of the financial or carbon savings generated by Abbeyleix CNU, which is not an acute hospital.
The HSE appears to want to proceed quickly with the process, as bidders are advised that the tenders will be open on July 21, 2026. The health authority says it wants the panels installed in three months.
